top of page

Newcrest Fuel Skid
CLIENT
Newcrest
LOCATION
Papua New Guinea
SCOPE OF WORK
MTIS Group was contracted to engineer, design and supply a 'turn-key' solution for the inline filtration of 190,000L of diesel per day.
Working together with our partner Banlaw, MTIS Group designed a duty/standby vessel filtation unit complete with inward and outward flow isolation (manually operated) using a single galvanised skid for bunding purposes along with the mounting of valves, pipe spools and lifting points. A laydown area for the servicing of filter socks and water absorption elements was also included.

Engineered Solutions
![IMG_0768[3]](https://static.wixstatic.com/media/b0b974_fb500fde4b8b4a4a96e415c4c16bb0a7~mv2_d_4032_3024_s_4_2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/b0b974_fb500fde4b8b4a4a96e415c4c16bb0a7~mv2_d_4032_3024_s_4_2.jpg)
IMG_0768[3]
![IMG_0747[1]](https://static.wixstatic.com/media/b0b974_7d24f44178a14386b35fa554ca4d6168~mv2_d_3024_4032_s_4_2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/b0b974_7d24f44178a14386b35fa554ca4d6168~mv2_d_3024_4032_s_4_2.jpg)
IMG_0747[1]

Engineered Solutions
1/3
bottom of page