Rig 115 – Pre Works & Commissioning

Client

Drilling

Location

Port Moresby, Papua New Guinea

SCope of Work

MTIS Group was contracted to complete the following scope of works.

  • Draw works planetary gearset inspection and rectification works
  • Draw works fluid maintenance
  • Trip tank modifications to dual tank configuration
  • Trip tank piping
  • Hydraulic controller re-hosing, pressure testing, coupling modifications and pressure gauge replacement
  • Hoists rebuild and load test certification
  • Electrical works
  • Camp water & sewage treatment system upgrades