Awarded by Clough for the new Port Moresby Power Station, MTIS delivered the full pre-commissioning scope on all major and minor pipework services: cleaning, flushing, pressure testing, nitrogen purging, desiccant drying, UHP heat-exchanger descaling, and torque and tensioning.
A multi-service pre-commissioning scope was sequenced per service so each line could be released to commissioning as soon as it was cleared, rather than holding the full programme behind the slowest line. Cleaning, pressure testing, drying, descaling and torque records were tracked line-by-line against the client cleanliness specification.
Engine hall and pipework systems. |
Port Moresby Power Station site. |
MTIS pre-commissioning service scope. |
|
All pipework accepted for use without any safety incidents and met the client cleanliness specification. Clough was able to commission the associated pipework without vendor equipment failures or incidents. That is the result the pre-commissioning programme is paid to produce.