FMS – Oro Province

Client

Palm Oil Company

Location

Papua New Guinea

SCope of Work

MTIS Group was contracted to engineer, design and supply a ‘turn-key’ solution for the inline filtration of 150,000L of diesel per day.

Working together with our partner Banlaw, MTIS Group designed a duty / standby vessel filtation unit complete with inward and outward flow isolation (manually operated) using a single galvanised skid for bunding purposes along with the mounting of valves, pipe spools and lifting points. A laydown area for the servicing of filter socks and water absorption elements was also included.

  • ​6 Advanced Controllers
  • 6 EDP Panels
  • 10 TLM monitoring systems

Gallery