Rig 115 - Pre Works & Commissioning
CLIENT
Drilling
LOCATION
Port Moresby, Papua New Guinea
SCOPE OF WORK
MTIS Group was contracted to complete the following scope of works.
-
Draw works planetary gearset inspection and rectification works
-
Draw works fluid maintenance
-
Trip tank modifications to dual tank configuration
-
Trip tank piping
-
Hydraulic controller re-hosing, pressure testing, coupling modifications and pressure gauge replacement
-
Hoists rebuild and load test certification
-
Electrical works
-
Camp water & sewage treatment system upgrades