Newcrest Fuel Skid
Client
Newcrest
Location
Papua New Guinea
Scope of Work
MTIS Group was contracted to engineer, design and suppyl a 'turn-key' solution for the inline filtration of 190,000L of diesel per day.
Working together with our partner Banlaw, MTIS Group designed a duty / standby vessel filtation unit complete with inward and outward flow isolation (manualy operated) using a single galvanised skid for bunding purposes along with the mounting of valves, pipe spools and lifting points. A laydown area for the servicing of filter socks and water absorbtion elements was also included.