Heavy Vehicle Refuelling

Client

Mining

 

Location

Papua New Guinea

Scope of Work

MTIS Group was contracted to engineer, design and suppyl a 'turn-key' solution for the inline filtration of 190,000L of diesel per day.

 

Working together with our partner Banlaw, MTIS Group designed a duty / standby vessel filtation unit complete with inward and outward flow isolation (manualy operated) using a single galvanised skid for bunding purposes along with the mounting of valves, pipe spools and lifting points. A laydown area for the servicing of filter socks and water absorbtion elements was also included. 

Fuel Dispensing
Fuel Dispensing

press to zoom
Fuel Dispensing
Fuel Dispensing

press to zoom
1/1